Bernard Block Substation
Project Description
The Bernard Block project is a key urban development in Kelowna, BC. In partnership with Mission Group and FortisBC, Primary provided innovative utility solutions, including engineering both the utility-owned switchgear and the customer-owned unit substation, along with distribution upgrades to power a high-rise in the city’s core. Completed in 2023, the project showcased Primary’s expertise in delivering critical utilities for complex developments.
Results
The Bernard Block project showcases Primary’s expertise in solving complex urban infrastructure challenges. Our team designed utility upgrades and engineered a custom substation to meet strict standards, providing reliable solutions that support sustainable growth in a thriving community in British Columbia.
Highlights
Urban Utility Upgrades: Successfully designed and implemented utility distribution feeder upgrades in a densely populated area, overcoming significant logistical challenges.
Custom Substation Engineering: Engineered and constructed a custom unit substation to meet FortisBC's stringent interconnection standards, supporting a total building load of approximately 4.5 MVA (megavolt-amperes).
Strategic Equipment Placement: Collaborated closely with the client to identify and maximize on-site real estate for equipment installation, ensuring efficiency and seamless integration.
Comprehensive Technical Services: Delivered end-to-end engineering support, including specifications development, tendering, fault-level analysis, protection settings, and grounding system assessments, ensuring full regulatory compliance.