Service:
Design

  • Southlands Customer Build

    At more than 530 acres, Southlands is North America’s largest self-sustaining community deliberately rooted in food and farming

  • Protected: Bitcoin Data Centre Addition

    There is no excerpt because this is a protected post.

  • Mill Street Substation

    Explore Primary’s substation upgrade at Mill Street for Nelson Hydro where we replaced aging infrastructure to improve reliability and expand capacity.

  • Bernard Block Substation

    The Bernard Block project is a hallmark of urban development in Kelowna, BC, addressing the city’s growing infrastructure needs.

  • Trans Mountain 138kV Transmission Line

    Primary engineered a 723-meter self-supported span across the North Thompson River Black Pines, BC to serve the growing energy demands in the region

  • The Patch Brewery

    The Patch Brewery required comprehensive design and implementation of electrical systems, including power distribution, lighting, and communication networks, all tailored to meet the highest standards of performance, efficiency, and regulatory compliance.

  • 100MVA Cryptocurrency Datacenter

    100MVA 138kV:25kV substation and 25kV distribution system to feed the client’s datacenter facility.

  • Christina Lake Bitcoin Mine

    Primary was contracted by DMG Blockchain Solutions (DMG) with a nearly insurmountable task at hand

  • 30MVA Cryptocurrency Mine

    Primary designed and supported the construction of a 30 MVA substation expansion for a cryptocurrency

  • Community of Birds Hill

    Primary provided full turnkey services for a 2.6 km fibre node split build within the Rural Municipality of East St. Paul in Manitoba