Scope
The Mill Street Substation, serving the City of Nelson in British Columbia, required a substation upgrade due to aging 42-year-old infrastructure. The need for replacement became more urgent following a transformer failure caused by wildlife interference. The substation upgrade project focused on replacing the failed transformer, improving power reliability, and increasing capacity to meet future load growth.
Primary was selected by Nelson Hydro to provide comprehensive engineering services for the project. The scope included defining the architecture for a brownfield substation replacement, along with structural and civil engineering for foundations and steelwork. The electrical design covered electrical apparatus layout and specifications, conduit and cable schedules, power system studies - including grounding, lightning, load flow, short circuit analysis, and transient modeling. Additionally, the project involved developing the communications and control architecture, ensuring seamless SCADA integration for efficient system management.
The project design included outdoor high-voltage transmission structures, two large power transformers, and a state-of-the-art electrical house (E-House) that safely enclosed advanced switchgear. Modern protection systems, real-time power monitoring, and smart communication technology reduced wiring and improved efficiency and reliability.
“Primary was solid to work with throughout the project. Their responsiveness kept things moving without delays waiting on engineering feedback. They were realistic about the commissioning challenges and allocated resources well to handle any issues as they came up. They followed through on their commitment to provide support through to energization and beyond.”
Kevin D’Netto, P.Eng. | Electrical Power Systems Engineer | Nelson Hydro
The Result
The success of the Mill Street Substation upgrade highlights the expertise, innovation, and collaboration of our team. Through careful planning and a staged approach, we minimized interference with existing facilities while implementing strategic modifications, such as adjusting T1 oil containment and rerouting medium-voltage feeder cables for seamless integration. This substation upgrade not only enhances operational efficiency and reliability but also increases capacity to support future growth and integrates advanced communication technologies for streamlined operation. Now serving approximately 6,000 customers, the upgraded Mill Street Substation stands as a model for modernized, scalable power infrastructure and showcases the value of proactive planning, innovative problem-solving, and collaborative execution.