ProjectsDesignSturgis Rebuild, SK

Sturgis Rebuild, SK

Sturgis Rebuild, SK

  • TYPE:
  • Design
  • LOCATION:

ABOUT PROJECT

The Sturgis Rural Rebuild addressed the concerns associated with aging distribution infrastructure by removing existing power line and poles located in landowners’ private fields/land and rebuilding new infrastructure within the road allowance. The benefits of rural rebuild design includes: improved service reliability, reduced outages, improved access to infrastructure for maintenance and operating staff, reduced footprint on private property, reduced risk of powerline contacts and line loss savings (kW) due to upgraded conductor.

Services Offered: Design, stakeholder engagement, landowner consultation, protection and coordination, materials estimate and vegetation assessment for ~ 60 kilometers of electrical distribution infrastructure.

Health, Safety & Environment is our Primary focus.

There's nothing more important than doing our job safely.

© 2018 Primary Engineering and Construction Corporation all rights reserved.