Operational study to resolve imbalance issues with 2 feeders in Peachland which resulted in customer complaints.
Type: Planning & Analysis
Shallow Utility Design-Build for 4 Party Commercial Subdivision
Type: Commercial
Key in leading a four party trench initiative which reduced installation costs and coordination.
Type: Residential URD
4-Party shallow underground installation for new residential subdivision and commercial services.
Type: Design Project Management
The Kelowna spatial forecast used a hybrid simulation-trending model to predict future loads.
Type: System Planning
Design & rebuild power and communication systems from 4.16 kV to 13.8 kV for approx.
Developed the most cost effective plan by optimizing existing system capacity.
Type: Long Term Planning
4-Party shallow underground installation for 400 lot residential subdivision and commercial services.
Reviewed the fusing types, standardized fusing sizes, VFI settings, and coordination with substation protection.
Hawkstone is a Turnkey residential subdivision, which is a design, procure and construction of four party shallow utilities.
Type: Design-Build Residential
CYMDIST to analyze the 82 feeders, failures investigated and optimal solutions recommended.
Type: Short Term Planning
4-Party shallow underground installation for 82 residential subdivision and commercial services.
Type: Commercial Residential URD
Type: Design-Build - Residential
Complete design-build EPCM of the shallow utility infrastructure for large retail mall and horse racing facility encompassing six quarter sections of land.
Type: Commercial Retail
The project included an electrical system upgrade from 4kV to 12kV and the conversion to underground of approximately 2 km of the overhead high voltage system from First Beach to Third Beach in Stanley Park.
Type: Design-Build
The Greens is a Turnkey residential subdivision, which is a design, procure and construction of four party shallow utilities.
Primary was engaged to address the concerns of ageing distribution infrastructure and to rebuild new infrastructure.
Type: Design
Lake Vista has become a Turnkey residential subdivision, which is a design, procure and construction of four party shallow utilities.
Primary was engaged to design an 84MVA substation which was required to power a crypto-mining facility in the West Kootenay area of BC.
Lake Vista is a Turnkey residential subdivision, which is a design, procure and construction of four party shallow utilities.
There's nothing more important than doing our job safely.